当前位置: X-MOL 学术Proc. Inst. Civ. Eng. Civ. Eng. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Examples of integrating hydraulic equipment into temporary works
Proceedings of the Institution of Civil Engineers - Civil Engineering ( IF 0.8 ) Pub Date : 2023-03-10 , DOI: 10.1680/jcien.22.00150
Mercedes Ascaso Til 1 , Wilson Wong 2
Affiliation  

This paper focuses on the integration of hydraulic equipment into temporary works and how they can work together to provide safe and effective solutions across different fields of civil engineering. The focus is on the challenges faced by temporary works designers and how to solve them by integrating hydraulics into innovative modular construction methods for structures such as high-rise buildings, airport infrastructure and sports stadia, with notable examples provided from around the world. The paper also covers high-capacity tower systems for refinery construction and various bridge construction projects, from concrete viaducts to suspension bridges.

中文翻译:

将液压设备集成到临时工程中的示例

本文重点介绍将液压设备集成到临时工程中,以及它们如何协同工作以提供跨土木工程不同领域的安全有效的解决方案。重点是临时工程设计师面临的挑战,以及如何通过将液压技术集成到高层建筑、机场基础设施和体育场馆等结构的创新模块化施工方法中来解决这些挑战,并提供了来自世界各地的著名示例。该白皮书还涵盖了用于炼油厂建设和各种桥梁建设项目(从混凝土高架桥到悬索桥)的大容量塔架系统。
更新日期:2023-03-10
down
wechat
bug