Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Evolutionary game analysis of collaborative application of BIM platform from the perspective of value co-creation
Engineering, Construction and Architectural Management ( IF 4.1 ) Pub Date : 2024-04-11 , DOI: 10.1108/ecam-01-2024-0009
Xiaowei An , Sicheng Ren , Lunyan Wang , Yehui Huang

Purpose

The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective of value co-creation, the research results can provide support for the collaborative application and contract design of BIM platform.

Design/methodology/approach

In this paper, an evolutionary game model involving the owner, designer and constructor is constructed by using prospect theory and evolutionary game theory. Through simulation analysis, the evolution law of the strategy choice of each party in the collaborative application of BIM platform is discussed and the key factors affecting the strategy choice of all parties are analyzed.

Findings

The results show that there is an ideal local equilibrium point with progressive stability in the evolutionary game between the three parties: “the construction party shares information, the designer receives the information and optimizes the project and the owner does not provide incentives”; in addition, the opportunistic behaviors of the design and construction parties, as well as the probability of such behaviors being detected and the subsequent punishment have a significant impact on the evolutionary outcome.

Originality/value

This method can provide support for the collaborative application and contract design of BIM platform.



中文翻译:

价值共创视角下BIM平台协同应用演化博弈分析

目的

本文的目的是探讨建筑信息模型(BIM)对项目建设中多方协作的支持。基于价值共创的视角,研究成果可为BIM平台的协同应用和合同设计提供支撑。

设计/方法论/途径

本文运用前景理论和演化博弈理论,构建了业主、设计者、施工者的演化博弈模型。通过仿真分析,探讨了BIM平台协同应用中各方策略选择的演化规律,分析了影响各方策略选择的关键因素。

发现

结果表明,三方之间的演化博弈存在一个渐进稳定的理想局部均衡点:“施工方共享信息,设计方接收信息并优化项目,业主不提供激励”;此外,设计方和施工方的机会主义行为,以及此类行为被检测到并受到后续惩罚的概率,对进化结果有显着影响。

原创性/价值

该方法可为BIM平台的协同应用和合同设计提供支持。

更新日期:2024-04-10
down
wechat
bug