A note on lot scheduling on a single machine to minimize maximum weighted tardiness

  • Published:
Journal of Combinatorial Optimization Aims and scope Submit manuscript

Abstract

We study a single machine lot scheduling problem. Customers’ orders may be processed simultaneously in the same lot. The order sizes are assumed to be order-dependent, and the lots have identical size and identical processing time. Orders may be split, i.e., their processing may be performed on two consecutive lots. We assume order-dependent due-dates and weights, and the goal is to minimize the maximum weighted tardiness among all orders. A polynomial time solution algorithm is introduced.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Data Availability

All input parameters for the simulations were generated randomly from given distributions.

References

  • Chen Y, Cheng Y, Zhang G (2020) Single machine lot scheduling with non-uniform lot capacities and processing times. J Combinat Opt 1:1–9

    Google Scholar 

  • Hou Y-T, Yang D-L, Kuo W-H (2014) Lot scheduling on a single machine. Inf Process Lett 114:718–722

    Article  MathSciNet  MATH  Google Scholar 

  • Lawler EL (1973) Optimal sequencing of a single machine subject to precedence constraints. Manage Sci 19(5):544–546

    Article  MATH  Google Scholar 

  • Mor B (2021) Single-machine lot scheduling with variable lot processing times. Eng Optim 53:321–334

    Article  MathSciNet  Google Scholar 

  • Mor B, Mosheiov G (2021) A note on the single machine CON and CONW problems with lot scheduling. J Combinat Opt 42:1–12

    MathSciNet  MATH  Google Scholar 

  • Mor B, Mosheiov G, Shapira D (2020) Lot scheduling on a single machine to minimize the (weighted) number of tardy orders. Inf Process Lett 164:106009

    Article  MathSciNet  MATH  Google Scholar 

  • Mor B, Mosheiov G, Shapira D (2021) Single machine lot scheduling with optional job-rejection. J Comb Optim 41(1):1–11

    Article  MathSciNet  MATH  Google Scholar 

  • Yang DL, Hou YT, Kuo WH (2017) A note on a single-machine lot scheduling problem with indivisible orders. Comput Oper Res 79:34–38

    Article  MathSciNet  MATH  Google Scholar 

  • Zhang E, Liu M, Zheng F, Xu Y (2019) Single machine lot scheduling to minimize the total weighted (discounted) completion time. Inf Process Lett 142:46–51

    Article  MathSciNet  MATH  Google Scholar 

  • Zheng F, Jin K (2019) An improved heuristic for single machine lot scheduling problem. IFAC-PapersOnLine 52(13):217–222

    Article  Google Scholar 

Download references

Acknowledgements

The first author was supported by the Israel Science Foundation (Grant No. 2505/19) and by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation – Project Number 452470135).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Assaf Sarig.

Ethics declarations

Conflict of interest

The authors have no relevant financial or non-financial interests to disclose.The authors have no conflicts of interest to declare that are relevant to the content of this article. All authors certify that they have no affiliations with or involvement in any organization or entity with any financial interest or non-financial interest in the subject matter or materials discussed in this manuscript. The authors have no financial or proprietary interests in any material discussed in this article.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Appendix A

Appendix A

Strong NP-hardness of the case of no order splitting.

Theorem

Problem \(1\left|Lot, No-split\right|{T}_{max}^{W}\) is NP-hard in the strong sense even when all the orders share a common due-date and all orders have identical weights.

Proof

We prove by reduction from the strongly NP-hard problem, 3-Partition.

3-partition: Given \(3k\) positive integers, \({a}_{j}, j=1,\dots ,3k\), and a positive integer \(B\) such that \(\frac{B}{4}<{a}_{j}<\frac{B}{2}, j=1,\dots 3k\) and \({\sum }_{j=1}^{3k}{a}_{j}=kB\), does there exist disjoint sets \({A}_{1}, {A}_{2},\dots ,{A}_{k}\) such that \({\sum }_{j\in {A}_{i}}{a}_{j}=B, i=1,\dots ,k\)?

Based on 3-Partition, we create the following instance of P2:

There are \(n=3k\) orders, with processing times \({p}_{j}={a}_{j}, j=1,\dots ,3k\). The size of each lot is \(B\) and the processing time of each lot is 1. There is a common due-date for all the orders: \({d}_{j}=kB, j=1,\dots ,3k\). We show that 3-Partition has a YES answer if and only if the above instance has maximal weighted tardiness of zero.

Assume first that 3-Partition has a Yes answer. Then, there are \(k\) disjoint sets \({A}_{1}, {A}_{2},\dots ,{A}_{k}\), such that \({\sum }_{j\in {A}_{i}}{a}_{j}=B, i=1,\dots ,k\). Schedule each set in a single lot, hence, the orders are processed in exactly \(k\) lots, and the last lot is completed at time \(kB\), implying that there are no tardy orders i.e., \({T}_{max}^{W}=0\).

Assume now that 3-Partition does not have a Yes answer. Then, there must be at least one lot which is not fully used, i.e., the total size of the orders assigned to this lot is strictly smaller than \(B\). It follows that the solution must contain at least \(k+1\) lots, and therefor \({T}_{max}^{W}>0\). \(\hfill \square\)

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Mosheiov, G., Sarig, A. A note on lot scheduling on a single machine to minimize maximum weighted tardiness. J Comb Optim 45, 128 (2023). https://doi.org/10.1007/s10878-023-01040-7

Download citation

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s10878-023-01040-7

Keywords

Navigation